Jipp sidewalk project

 

Statement of work

 

 

June 22, 2010

 

 

 

Remove north sidewalk (6 by 70) and 5 by 6 section in front of the Jipp per drawing.

 

Dig 2 wide drainage trench to 6 below top of limestone foundation along north wall of the Jipp. This is about 6 deep at the Northeast corner and about 3 at the northwest corner. Pitch 1/8 per foot minimum.

 

Continue trench southwest under rear driveway until daylight.

 

Line south side and bottom of trench along building with rubber liner and run 4 drainage pipe.

 

Fill with crushed stone.

 

Pour 1footer for front porch and 3 footers for side entrance handicap ramp per drawing.

 

Pour new sidewalk - 6 wide 51 long, 4 wide by 19 long, one 4 by 5 slab at northeast corner and one 2 by 4 section at entrance to ramp. All with 4 curb along south side per drawing.

 

Grade driveway 12 by 40 and cover with crushed rock.