Jipp sidewalk project

 

Statement of work

 

 

June 22, 2010

 

 

 

Remove north sidewalk (6’ by 70’) and 5’ by 6’ section in front of the Jipp per drawing.

 

Dig 2’ wide drainage trench to 6” below top of limestone foundation along north wall of the Jipp. This is about 6” deep at the Northeast corner and about 3’ at the northwest corner. Pitch 1/8” per foot minimum.

 

Continue trench southwest under rear driveway until daylight.

 

Line south side and bottom of trench along building with rubber liner and run 4” drainage pipe.

 

Fill with crushed stone.

 

Pour 1footer for front porch and 3 footers for side entrance handicap ramp per drawing.

 

Pour new sidewalk - 6’ wide 51’ long, 4’ wide by 19’ long, one 4’ by 5’ slab at northeast corner and one 2’ by 4’ section at entrance to ramp. All with 4” curb along south side per drawing.

 

Grade driveway 12’ by 40’ and cover with crushed rock.